Serving Brantford, Brant County, Ancaster and Hamilton

Monday to Friday, 8:00 am to 5:30 pm 5.0 on Google

Kitchen renovations in Brantford

Kitchen renovation in Brantford, managed from start to finish by one contractor: layout, cabinetry, countertops, tile, plumbing and lighting, planned around how you cook and live.

(289) 925-3308
5.0 on Google from 26 reviews
  • Licensed and insured
  • Free written estimates
  • One contractor from start to finish
Renovated kitchen with a grey island, quartz counter and glass pendant lights
Typical time on site
4 to 8 weeks on site
Building permit
Needed if walls or plumbing move
Estimate
Free, with a clear price before work begins

Renos by Windfeld is a kitchen renovation company based in Brantford. We take on everything from a like-for-like update to a full kitchen remodelling project with walls moved and a new layout. You deal with one general contractor from the first measurement to the final walkthrough, and you get a clear written estimate before anything is ordered. We renovate kitchens across Brantford and Brant County, including Paris, Burford and St. George.

What a kitchen renovation with Renos by Windfeld includes

  • Measuring, layout planning and a clear scope before anything is ordered
  • Careful tear-out and disposal of the old kitchen
  • Cabinets, islands and pantry storage, installed level and square
  • Countertops, templated and fitted once the cabinets are in
  • Tile backsplashes and new flooring
  • Plumbing for sinks, faucets, dishwashers and fridge water lines
  • Lighting, from pot lights to pendants and under-cabinet strips
  • Drywall repair, trim and the finishing details

Our kitchen renovation process

  1. Consultation. We visit, measure and ask how you use the kitchen: who cooks, what isn’t working and what you’d like to spend.
  2. Design and budget. We settle the layout, the cabinetry, the countertops and the appliances the cabinets will be built around. Then you get a written estimate.
  3. Permits and ordering. If walls or plumbing are moving, we apply for the building permit. Cabinets are ordered first, because they take the longest to arrive.
  4. Build. Tear-out, rough plumbing and electrical, drywall, flooring, cabinets, countertops, backsplash and lighting, in that order. Electrical work is done by a licensed electrical contractor, who files it with the Electrical Safety Authority.
  5. Final walkthrough. We go through the finished kitchen together and put right anything that isn’t.

Typical timeline. Most kitchens take four to eight weeks on site once the materials have arrived. Cabinets usually have the longest lead time, so we order them first and schedule the tear-out around their delivery.

What drives kitchen renovation costs in Brantford

Layout changes
Moving the sink, the range or a wall adds plumbing, electrical and sometimes structural work. Keeping the layout is the simplest way to hold the price.
Cabinetry
The largest single cost in most kitchens. Stock, semi-custom and custom lines differ widely, and so do the details: drawers cost more than doors, and tall pantry units more than base cabinets.
Countertops
Laminate costs least. Quartz and granite are priced by the square foot, with cut-outs and edge profiles extra.
Appliances
Usually bought separately from the renovation. Choose them early, because the cabinets are built around their sizes.
Older-home surprises
Levelling a floor, or replacing old plumbing and wiring found behind the walls, can add to the job. We show you before we go further.

Your price comes from a site visit, in writing, before any work begins. When you compare quotes, check whether each one includes HST, permits and disposal. For more on budgeting, read What a kitchen renovation costs in Brantford, and what drives the price.

Kitchen layouts and upgrades we build

Islands and peninsulas
Seating, prep space and storage in one piece, sized so people can still move around it.
Pantries
Walk-in, pull-out or a wall of tall cabinets, placed where the groceries come in.
Open-concept wall removal
Opening the kitchen to the dining or living room. We confirm what the wall carries, arrange the engineering and get the permit.
Lighting
Pot lights for the room, pendants over the island and under-cabinet strips where you work.
Backsplash and counters
Tile to the underside of the cabinets or to the ceiling, with counters templated once the cabinets are set.

Planned around how you cook

A good kitchen starts with questions, not cabinets. Who cooks, how many people are in the room at once, where the groceries land, and what drives you up the wall about the kitchen you have now.

From there we work out the layout: where the sink, range and fridge sit, whether an island earns its space, and how much storage you really need. You see the plan and the price before any work begins.

One schedule for every trade

A kitchen pulls in more trades than any other room: demolition, plumbing, electrical, drywall, flooring, cabinetry, counters and tile. The order matters, and one late delivery can stall everything behind it.

We run the whole sequence, order long-lead items early and time the tear-out so your kitchen is out of service for as short a stretch as possible. Electrical work is completed by a licensed electrical contractor.

Living through it

You will be without a kitchen for a while, so we plan for that with you. We protect the rooms around the work, keep dust contained as far as we can and tidy up at the end of each day.

Kitchens in older Brantford homes

In Holmedale, Eagle Place and the streets off Brant Avenue, the kitchen is often a narrow room at the back of a century home, walled off from the dining room. Opening it up is usually possible. It also means dealing with plaster, old wiring and floors that have settled, so we look closely before we price. How we renovate century and heritage homes

Newer parts of the city bring different jobs. In Brier Park and Lynden Hills, kitchens from the 1970s and 1980s still have their dropped bulkheads and a peninsula that blocks the room. In West Brant the layouts are already open, and the upgrade is in the cabinetry, stone and lighting. The plan, the price and the surprises differ for each, and we’ll tell you what to expect for yours.

Often done at the same time

A kitchen rarely stops at the doorway. Many clients carry the new flooring through the rest of the main floor, or have a bathroom renovated while the trades are already on site. If the project is growing past a room or two, read about whole home renovations.

Do I need a building permit?

Replacing cabinets, counters and finishes generally doesn’t need a building permit. Moving or removing walls, or altering the plumbing, does. We confirm what your project needs before work starts and build the permit time into the schedule.

Read the building permit guide

Recent kitchen projects

Real projects, photographed on site.

More kitchen projects
Kitchen with a stainless range hood, grey cabinets and an island
Range wall and island
Kitchen island with a built-in wine fridge and quartz counter
Island with built-in wine fridge
White shaker kitchen with a stainless range and subway tile backsplash
White shaker cabinets
Kitchen with white upper cabinets, dark counters and grey plank flooring
New cabinets, counters and flooring

What homeowners say about Renos by Windfeld

Rated 5.0 on Google from 26 reviews. A few lines from clients, in their own words.

Read more reviews
  • “We had a transformation.”

    Pamela and JonathanKitchen, bathrooms and basement

  • “Your estimate was right on the money”

    John & Julie ArrellWindows and doors

  • “He completed the job on time and added no hidden charges.”

    MaryBasement and laundry room

Kitchen renovation FAQs

Something else on your mind? Call us at (289) 925-3308, or see all common questions.

How much does a kitchen renovation cost in Brantford?

It depends on the size of the room, the cabinetry and countertops you choose, and whether the layout changes. The section above explains what moves the price, and our kitchen renovation cost guide goes further. For a firm number we need to see the room. The estimate is free.

How long does a kitchen renovation take?

Typically four to eight weeks on site, from tear-out to the final walkthrough. Cabinets have the longest lead time, so we order them first and time the tear-out to their delivery.

Do I need a building permit to renovate my kitchen?

Not to replace cabinets, countertops and finishes. In Brantford you do need one to add or relocate plumbing fixtures, or to remove a load-bearing wall. We confirm what applies before work starts and handle the application.

Can I stay in my home during the renovation?

Yes, and most clients do. We help you plan a temporary kitchen, keep the dust contained and tidy up at the end of each day.

Do you supply the cabinets and countertops?

Yes. We can supply and install the cabinetry and countertops as part of the job, or install ones you’ve chosen yourself. Either way, they’re measured and ordered against the final layout.

Which areas around Brantford do you serve?

We renovate kitchens in Brantford, Paris, Burford, St. George and across Brant County, and as far as Ancaster, Hamilton and Cambridge.

Tell us what you’re planning.

Estimates are free. You’ll get a clear price and a realistic timeline before any work begins.

(289) 925-3308
Hours
Monday to Friday, 8:00 am to 5:30 pm
Based in
Brantford, Ontario
Call

Get a free estimate

Three quick steps. Takes about a minute.

Step 1 of 3What are you planning?

Choose everything that applies. Big or small, we’re glad to take a look.

Inside

Additions and builds

Outside

Prefer to talk? (289) 925-3308

Monday to Friday, 8:00 am to 5:30 pm