The short version
- Whether you need a permit depends on your municipality, the deck’s height and whether it’s attached to the house.
- Footings must reach below the frost line, or the deck will move.
- Pressure-treated wood costs least up front. Composite costs most and needs the least upkeep.
Do you need a permit?
It depends on where you live. Here’s what local municipalities publish:
| Municipality | When a deck needs a building permit |
|---|---|
| County of Brant | When it’s more than 24 inches above grade at any point, or has a roof |
| City of Hamilton | When it’s attached to the house or used with a pool. A detached rear-yard deck under 10 square metres and less than 24 inches high may not need one |
| City of Cambridge | When it’s 24 inches or more above grade |
| City of Brantford | Confirm with the Building Department before you design |
Even when no building permit is needed, zoning rules on setbacks and lot coverage still apply. If a deck needs a permit, expect to submit a site plan and construction drawings showing the footings, framing, stairs and guards. Our permit guide covers sheds, fences and other backyard structures as well.
Footings: the part that matters most
In southern Ontario the ground freezes deep in winter. As it freezes, it expands and lifts whatever sits in it. Deck footings have to reach below that frost line, typically about four feet down, or the deck will heave in winter and settle unevenly in spring. Your building department confirms the depth for your area.
Before any holes are dug, buried utilities have to be located. In Ontario that’s arranged through Ontario One Call, and it’s free.
Framing and the connection to the house
Where a deck attaches to the house, that connection carries a lot of load and is a common place for water to get in. It needs to be bolted to solid framing and flashed so rain runs away from the wall, not into it. The beams, joists and posts are then sized for the span and the load, which is exactly what permit drawings check.
Guards and stairs
A deck more than 24 inches above the ground needs a guard, and higher decks need taller ones. Stairs have their own rules for rise, run and handrails. These are safety requirements, and they’re among the first things an inspector looks at.
Choosing the decking
| Material | Up-front cost | Upkeep | Good to know |
|---|---|---|---|
| Pressure-treated wood | Lowest | Clean and seal regularly | The standard choice. Can crack and warp as it dries |
| Cedar | Middle | Seal to keep its colour, or let it turn grey | Naturally resistant to rot, warmer in look, softer underfoot |
| Composite | Highest | Wash occasionally | No sealing or staining. Can get hot in full sun |
Whatever goes on top, the frame underneath is normally pressure-treated lumber.
Size it for how you’ll use it
- A dining table for six needs more room than most people expect, once chairs are pulled out.
- Keep the barbecue away from the door and out of the main walking path.
- Think about the sun at the time of day you’ll use the deck most.
- A privacy screen on one side can make a small yard feel far more comfortable.
Planning the rest of the yard at the same time? A deck usually sits alongside fence construction and landscaping, and all three are easier to design together.
How long it takes
Once materials and any permit are in hand, most decks are built in one to two weeks. See how we approach deck building.