The short version
- Finishing a basement needs a permit in both the City of Brantford and the County of Brant.
- Paris, St. George, Burford, Mount Pleasant, Oakland and Scotland are in the County, not the City.
- Electrical work is covered separately, through the Electrical Safety Authority.
First, which municipality are you in?
The City of Brantford and the County of Brant are two different governments. If you live in Paris, St. George, Burford, Mount Pleasant, Oakland or Scotland, your permits come from the County of Brant. If you live inside Brantford’s city limits, they come from the City.
Common projects at a glance
| Project | City of Brantford | County of Brant |
|---|---|---|
| Finishing a basement | Permit required | Permit required |
| Removing a load-bearing wall or other structural change | Permit required | Permit required |
| Adding or relocating plumbing fixtures | Permit required | Permit required |
| Replacing a fixture in the same location | May not be required | Ask the County |
| Deck | Ask the City | Required if over 24 inches above grade at any point, or if it has a roof |
| Detached storage shed | Required at 15 square metres and over | Generally exempt up to 15 square metres if conditions are met |
| Attached garage, carport or shed | Required at any size | Permit required |
| Cabinets, counters, flooring and paint | No permit | No permit |
| Demolishing a structure | Demolition permit required | Permit required |
This table is a summary of each municipality’s published guidance in November 2026. Rules change and every property is different, so confirm with the building department before you start.
Other approvals to know about
Electrical. A building permit does not cover electrical work. In Ontario, anyone you hire to do electrical work in your home must be a Licensed Electrical Contractor, and they file a notification of work with the Electrical Safety Authority.
Heritage. Brantford has two heritage conservation districts, Brant Avenue and Victoria Park Square, as well as individually designated properties. Major alterations to a designated property need a heritage permit from the City.
Near the river. Work in or near rivers, streams, wetlands and slopes may need a permit from the Grand River Conservation Authority.
Fences. Fences do not usually need a building permit, but they do have to follow the local fence by-law. In Brantford, for example, a fence in the required front yard of a residential property can be no more than one metre high.
Zoning. Even where no building permit is needed, zoning rules on setbacks, height and lot coverage still apply to sheds, decks and other structures.
How long a permit takes
It depends on the project and how complete the application is. The County of Brant quotes 10 to 30 business days for review. A complete application with clear drawings is the best way to avoid going back and forth.
What happens if you skip it
Work done without a required permit can be ordered stopped, opened up for inspection or removed. It can also cause trouble with insurance claims and when you sell the house. The permit fee is small next to any of those.
Who applies?
Either the homeowner or the contractor can apply. When you hire us, we prepare the drawings, submit the application and meet the inspector at each stage. Tell us what you’re planning and we’ll tell you what it needs.
Sources
Planning a project like this?
We’ll come out, look at the space and give you a clear written price. The estimate is free. Read more about our basement renovations.